雙組份打膠機的遇到問(wèn)題要注意什么?
時(shí)間:2021-06-04 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械
1、在當天機器操作完畢后要把膠管內的膠沖出,防止硬化;如果長(cháng)時(shí)間不實(shí)用要注意用煤油清洗膠管和膠槍。
1. After the operation of the machine on the same day, the glue in the hose should be flushed out to prevent hardening; If it is not practical for a long time, pay attention to clean the hose and gun with kerosene.
2、雙組份打膠機使用的硅酮膠或聚硫膠要注意雜質(zhì)不能過(guò)高,低質(zhì)量的膠容易堵塞膠管的過(guò)濾系統,造成出膠不暢或不均勻。
2. For the silicone glue or polysulfide glue used in the two-component rubber beater, attention should be paid to that the impurities should not be too high. The low-quality glue is easy to block the filter system of the hose, resulting in poor or uneven glue delivery.
3、在更換膠的品種時(shí)要特別注意把雙組份打膠機內殘留的膠沖凈,好清洗,因為不同品種甚的膠容易反應堵塞機器。
3. When changing the type of glue, special attention should be paid to the residual glue in the two-component beater for cleaning, because different varieties or even brands of glue are easy to react and block the machine.
4、液壓站系統的壓力,不能調的太高,要根據室內環(huán)境溫度等實(shí)際情況,調滿(mǎn)足膠嘴正常出膠均勻打膠即可。打開(kāi)液壓站時(shí)一定要打開(kāi)膠槍?zhuān)駝tB組份管路壓力將升得很高,造成安 全事故。
4. The pressure of the hydraulic station system can not be adjusted too high. According to the indoor environment temperature and other actual conditions, the pressure should be adjusted to meet the requirements of the normal glue output of the rubber nozzle and the uniform glue injection. When opening the hydraulic station, the glue gun must be opened, otherwise the pressure of component B pipeline will rise very high, causing safety accidents.
雙組份打膠機
Two component gluing machine
5、A膠提膠泵連續工作1分鐘以上沒(méi)有供膠停止,說(shuō)明管路內有空氣,此時(shí)會(huì )警聲,須打開(kāi)泵上管接頭再打開(kāi)A膠提膠泵,直到出膠為止,停止并接好接頭,膠槍會(huì )出現有空氣的嗶嗶爆 破聲,空氣排凈就好了。
5. If the glue supply of a glue pump does not stop for more than 1 minute, it means that there is air in the pipeline. At this time, the alarm will sound. You must open the upper pipe joint of the pump, and then open the a glue pump until the glue is discharged. Stop and connect the joint. The glue gun will have a beep blasting sound with air, and the air will be drained.
6、硅酮膠B組份遇空氣會(huì )結殼,影響泵的正常工作和管路的暢通,因此,停機時(shí)B組份膠的所有通道在泄壓后均應關(guān)閉,使B組份不得接觸空氣。
6. Component B of silicone rubber will crust when encountering air, which will affect the normal operation of the pump and the smooth flow of the pipeline. Therefore, all channels of component B should be closed after pressure relief during shutdown, so that component B can not contact with air.
7、正常工作時(shí)不要斷氣源,如果發(fā)現斷氣源應停止工作。
7. Do not cut off the gas source during normal operation. If it is found that the gas source is cut off, stop working.
以上就是給大家分享的內容了,想要了解更多的精彩內容進(jìn)入我們的網(wǎng)站,或者是搜索我們的關(guān)鍵詞雙組份打膠機http://linshi.jncsjx.com查找,我們會(huì )有更多的精彩內容與您分享!
The above is to share the content, want to know more wonderful content into our official website, or search our keyword two-component glue machine http://ruiyingjituan.com Find, we will have more wonderful content to share with you!
- STJ03B型雙組份打膠機的性能和結構特點(diǎn) 2024/07/13
- 全自動(dòng)鋁條折彎機鋁框自動(dòng)打標技術(shù) 2024/07/11
- 中空玻璃打膠的好壞與哪些方面有關(guān)系? 2024/07/09
- 中空玻璃生產(chǎn)線(xiàn)和復合膠條中空玻璃生產(chǎn)線(xiàn)區別? 2024/07/04
- 中空玻璃加工設備故障分析流程 2024/07/03
- 中空玻璃加工設備的現場(chǎng)安裝事項要點(diǎn) 2024/06/27
- 中空玻璃的生產(chǎn)過(guò)程是怎樣的? 2024/06/24
- 中空玻璃生產(chǎn)線(xiàn)的構造及功能介紹 2024/06/19
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: