高壓柱塞泵是供膠機的動(dòng)力來(lái)源
時(shí)間:2018-04-17 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械
A組份提膠由電動(dòng)齒輪泵提供,經(jīng)管道輸送油壓驅動(dòng)的A膠高壓柱塞泵增壓。B組份提膠由氣動(dòng)往復泵提供,經(jīng)管道輸送油壓驅動(dòng)的B組分高壓柱塞泵增壓。
The A component is extracted from the electric gear pump and transported to the A high pressure piston pump driven by oil pressure. The B component is provided by pneumatic reciprocating pump and transported to the B component high-pressure piston pump driven by oil pressure.
CL-B-01型雙組份供膠機主要有A組份提膠泵、B組份提膠泵, A、B膠增壓裝置,高壓柱塞泵,A、B膠泵連接裝置,雙組分比例調節機構,高壓出口分流裝置,液壓控制系統,氣動(dòng)控制系統及電器控制系統等組成。
CL-B-01 type two component glue feeder mainly includes A component glue pump, B component extraction pump, A, B glue booster device, high pressure plunger pump, A, B glue pump connection device, double component proportional regulation mechanism, high pressure outlet safety shunt device, hydraulic control system, pneumatic control system and electrical control system.
供膠機的B組份膠出口處設有放泄閥,可以放氣或泄壓回流用,同位置還設置了超壓回流的裝置。在機頭上進(jìn)入混合器之前設有關(guān)斷球閥和單向止回閥,防止A、B組份膠互串,造成固化而堵塞通道。
The outlet of the B component of the glue feeding machine is equipped with a drain valve, which can be used for outgassing or pressure relief, and a safety device for overpressure reflux is also installed at the same location. Before the mixer enters the mixer, a shut-off ball valve and a one-way check valve are provided to prevent A and B components from interlocking, resulting in solidification and blocking the passageway.
B膠的體積比例由雙組分比例調節機構調整,然后,同時(shí)送入打膠機混合器,混合器由36節以上混合裝置組成,雙組份膠充分混合后到達涂膠槍?zhuān)瑥哪z嘴噴出,涂布于中空玻璃的邊緣進(jìn)行封邊。膠嘴設有啟動(dòng)快速關(guān)閉閥,用以準確控制出膠時(shí)間。
The volume ratio of B glue is adjusted by the double component proportional regulating mechanism, and then sent to the mixer mixer. The mixer is composed of 36 sections and above, and the double component glue is fully mixed to the glue gun, and the glue nozzle is sprayed out and coated on the edge of the hollow glass. The glue nozzle is equipped with a start-up quick closing valve to control the time of dispensing accurately.
A、B組份體積比例調節由雙組分比例調節機構完成。 A、B組份比例分配比的調節主要靠調節高壓泵前端連軒上的滑塊,向上調B膠出膠少,向下調B膠出膠多?;瑝K中心距上端軸中心線(xiàn)16.4cm時(shí),A/B膠的比例為10比1。
The volume ratio of A and B is adjusted by two-component proportional regulation mechanism. The adjustment of proportion distribution ratio of A and B mainly depends on adjusting the slide on the front side of the high-pressure pump, increasing the B glue and decreasing the number of B glue. The proportion of A/B glue is 10 to 1 when the center of the slide is 16.4cm from the center line of the upper shaft.
柱塞泵油壓調整裝置設在油槽上端蓋上面,可分別調整。
The oil pressure adjusting device of the plunger pump is arranged on the upper end cover of the oil groove, and can be adjusted separately.
本文由雙組份打膠機友情奉獻.更多有關(guān)的知識請點(diǎn)擊:http://linshi.jncsjx.com我們將用的技術(shù).真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會(huì )陸續向大家奉獻.敬請期待.
This article is dedicated to the double component glue machine. More related knowledge, please click: http://linshi.jncsjx.com we will use the most advanced technology. The most sincere attitude. Provide you with the most comprehensive service. More related knowledge will be devoted to you. Please look forward to it.
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
- 玻璃涂布機設備的使用流程 2024/05/28
- 全自動(dòng)封膠線(xiàn):封膠機的種類(lèi)有哪些? 2024/05/24
- 玻璃涂布機設備的使用流程 2024/05/23
- 立式丁基膠涂布機的分類(lèi)以及工作原理 2024/05/22
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: