雙組份打膠機的安裝要注意什么?
時(shí)間:2023-02-28 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械
1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1. The two-component sealant applicator equipment should be installed in a dry, dust-free and non-corrosive environment (this requirement is the same as other equipment, of course, if the conditions are not met, at least strive for non-corrosive gas, after all, there are wires and pipelines in the equipment, which are not highly resistant to corrosion).
2、室內溫度控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature shall be controlled on the indoor hard ground of 10~40 degrees, and the ground shall be level. (The ground levelness mentioned by the editor here needs to be very smooth. Our equipment has taken into account the complexity of the ground at the beginning of design, so it has a great tolerance for the ground levelness. It can normally work as long as it is not significantly improved.)
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3. Before installing the two-component sealant applicator, it is necessary to check whether there is deformation, damage and loosening of fasteners caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the sealant applicator, which caused the equipment to fail to operate normally. Our staff only found out the reason after arriving at the site.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4. First, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground levelness until the equipment is horizontal and stable. Then connect the wires according to the drawing and reliably connect the air source to the air source interface of the machine to ensure that there is no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46 # hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and turn it on to check whether the device can operate normally.
本文由雙組份打膠機提供技術(shù)支持,更多的詳細精彩內容請點(diǎn)擊我們的網(wǎng)站 http://ruiyingjituan.com我們將會(huì )全心全意為您提供滿(mǎn)意的服務(wù)。
This article is supported by the two-component gluing machine. For more details, please click our website http://ruiyingjituan.com We will wholeheartedly provide you with satisfactory service.
相關(guān)新聞 moer+
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
- 玻璃涂布機設備的使用流程 2024/05/28
- 全自動(dòng)封膠線(xiàn):封膠機的種類(lèi)有哪些? 2024/05/24
- 玻璃涂布機設備的使用流程 2024/05/23
- 立式丁基膠涂布機的分類(lèi)以及工作原理 2024/05/22
相關(guān)產(chǎn)品 moer+
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: