雙組份打膠機的安裝需要注意什么?
時(shí)間:2022-01-11 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械
1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室內溫度好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature is best controlled on the indoor hard ground of 10 ~ 40 degrees, and the ground should be better horizontal. (Xiaobian said that the ground levelness here must be very flat. Our equipment has taken into account the complexity of the ground at the beginning of design, so we have a great tolerance for the ground levelness. As long as the range is not large, it can generally work normally.)
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, resulting in the failure of normal operation of the equipment. Our staff found out the reason after arriving at the site.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4. Firstly, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and reliably ground, and connect the air source to the air source interface equipped with the machine to ensure that there is no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and turn it on to see if the device can operate normally.
感謝您的閱讀,此文的文章來(lái)源:雙組份打膠機更多的內容和問(wèn)題請點(diǎn)擊:http://linshi.jncsjx.com我們會(huì )繼續努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article: two-component gluing machine. For more contents and questions, please click: http://linshi.jncsjx.com We will continue to work hard to provide you with services. Thank you for your support!
- 全自動(dòng)鋁條折彎機鋁框自動(dòng)打標技術(shù) 2024/07/11
- 中空玻璃打膠的好壞與哪些方面有關(guān)系? 2024/07/09
- 中空玻璃生產(chǎn)線(xiàn)和復合膠條中空玻璃生產(chǎn)線(xiàn)區別? 2024/07/04
- 中空玻璃加工設備故障分析流程 2024/07/03
- 中空玻璃加工設備的現場(chǎng)安裝事項要點(diǎn) 2024/06/27
- 中空玻璃的生產(chǎn)過(guò)程是怎樣的? 2024/06/24
- 中空玻璃生產(chǎn)線(xiàn)的構造及功能介紹 2024/06/19
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: