RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    雙組份涂膠機流水線(xiàn)作業(yè)的生產(chǎn)需求

    時(shí)間:2020-10-27 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械

    雙組份涂膠機是生產(chǎn)中空、幕墻玻璃的專(zhuān)用設備,可一次完成二道密封中A、B組份混合與涂膠。適用配比精度高的膠種,滿(mǎn)足玻璃深加工企業(yè)高、高合格率流水線(xiàn)作業(yè)的生產(chǎn)需求,是大規模生產(chǎn)高檔中空玻璃及玻璃幕墻產(chǎn)品的一種理想的配套設備,調節減壓閥0.4~0.6Mpa,檢查系統有無(wú)漏氣現象。然后試運行以下動(dòng)作:(1)A泵提升;(2)A泵充氣;(3)B泵提升;(4)B泵充氣。注意:提升氣缸提升時(shí),如果兩氣缸不同步,請下降原點(diǎn)后重新操作。
    The double component coating machine is a special equipment for producing hollow and curtain wall glass. It can be used in two seals at one time to mix and glue A and B components. Suitable ratio of high precision rubber, meet glass deep-processing enterprises with high efficiency and high qualification rate of the production line operating needs, is an ideal equipment for mass production of high quality hollow glass and glass curtain wall products, regulating valve to 0.4~0.6Mpa, check system has no leakage. Then try to run the following actions: (1) A pump lifting; (2) A pump inflated; (3) B pump lifting; (4) B pump inflated. Note: when lifting the cylinder, if the two cylinder is not synchronized, please drop back to the original point and re operate.
    2、將A、B組份膠桶就位,并與A、B膠泵的軸線(xiàn)對中。
    2, the A, B component glue barrel is in place, and the axis of A, B glue pump is in the center.
    以A組份為例:
    Take A as an example:

    雙組份打膠機
    1)操作手動(dòng)轉閥,將A泵提升高,提升過(guò)程中觀(guān)察各管路有無(wú)拉伸過(guò)緊處。
    1) operate the manual transfer valve to elevate the A pump to the highest level.
    2)將膠桶放置在A(yíng)泵壓膠盤(pán)下,開(kāi)啟膠桶,將其中塑料袋外翻桶外,膠面塑料片取出。
    2) put the glue barrel under the A pump press disc, open the glue barrel, turn the plastic bag out to the bucket, and take the plastic sheet out.
    3)使A泵壓盤(pán)緩慢下降,壓盤(pán)入桶時(shí)應使其與桶口對準,將壓膠盤(pán)排氣口打開(kāi),直到壓盤(pán)接觸膠面。待壓盤(pán)內氣體全部排放完并有少量膠從排氣口溢出時(shí),即可關(guān)閉排氣閥。(提升開(kāi)關(guān)保持下壓狀態(tài))
    3) slow down the pressure plate of the A pump, when the pressure plate enters the barrel, it should be aligned with the buckets, and the vent opening of the press disc is opened until the press disc is exposed to the rubber surface. The exhaust valve can be closed when the gas is completely discharged and a small amount of glue is spilled from the exhaust port. (lift switch keep down pressure state)
    4)開(kāi)機試打膠:將主泵氣源開(kāi)關(guān)打開(kāi),按下膠槍開(kāi)關(guān),直A泵里空氣排凈槍口處出膠連續時(shí)停止。
    4) open machine test glue: open the main pump gas switch, press the glue gun switch until the air in the A pump is discharged at the mouth of the gun and stops when the glue is continuous.
    本文的精彩內容來(lái)自雙組份打膠機詳細內容請點(diǎn)擊我們的網(wǎng)站: http://ruiyingjituan.com謝謝您的到來(lái)!
    The wonderful content of this article comes from the detailed content of the double component glue machine, please click on our official website: http://ruiyingjituan.com thank you for your arrival!

    聯(lián)系我們Contact us

    • 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
    • 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
    • 掃碼聯(lián)系我們:

    截屏,微信識別二維碼

    微信號:13705446998

    // RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>
    新时代下载安装最新版 RM新时代投资安全吗 RM新时代注册 RM新时代是正规平台吗 rm新时代平台靠谱吗