RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    雙組份打膠機的操作介紹

    時(shí)間:2019-04-03 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械

    雙組份涂膠機是消費中空、幕墻玻璃的專(zhuān)用設備,可一次完成二道密封中A、B組份混合與涂膠。適用配比精度高的膠種,滿(mǎn)足玻璃深加工企業(yè)高、高合格率流水線(xiàn)作業(yè)的消費需求,是大范圍消費高檔中空玻璃及玻璃幕墻產(chǎn)品的一種理想的配套設備。下面我們就說(shuō)一下雙組份打膠機的操作如何!
    The two-component glue coating machine is a special equipment for consuming hollow and curtain wall glass. It can complete the mixing and gluing of A and B components in two seals at one time. It is suitable for mixing rubber with high precision and meets the consumption demand of high efficiency and high qualified rate pipeline operation in glass deep processing enterprises. It is an ideal matching equipment for large-scale consumption of high-grade and high-quality hollow glass and glass curtain wall products. Now let's talk about the operation of the two-component glue punch.
    1、接通氣源:氣源接通,調理減壓閥0.4~0.6Mpa,檢查系統有無(wú)漏氣現象。然后試運轉以下動(dòng)作:(1)A泵提升;(2)A泵充氣;(3)B泵提升;(4)B泵充氣。留意:提升氣缸提升時(shí),假如兩氣缸不同步,請降落原點(diǎn)后重新操作。
    1. Turn on the gas source: turn on the gas source, adjust the pressure relief valve to 0.4~0.6 Mpa, check whether there is air leakage in the system. Then test run the following actions: (1) A pump lifting; (2) A pump inflating; (3) B pump lifting; (4) B pump inflating. Note: When lifting the cylinder, if the two cylinders are not synchronized, please drop to the origin and re-operate.
    2、將A、B組份膠桶就位,并與A、B膠泵的軸線(xiàn)對中。以A組份為例:
    2. Position the rubber drums of component A and B and align them with the axes of the rubber pumps of component A and B. Take Component A as an example:
    1)操作手動(dòng)轉閥,將A泵提升高,提升過(guò)程中察看各管路有無(wú)拉伸過(guò)緊處。

    雙組份打膠機
    1) Manual rotary valve is operated and pump A is lifted to the highest level. In the process of lifting, the pipelines are inspected to see if they are stretched too tightly.
    2)將膠桶放置在A(yíng)泵壓膠盤(pán)下,開(kāi)啟膠桶,將其中塑料袋外翻桶外,膠面塑料片取出。
    2) Place the rubber drum under the A pump pressure rubber disc, open the rubber drum, turn the plastic bag out of the drum, and take out the plastic sheet.
    3)使A泵壓盤(pán)遲緩降落,壓盤(pán)入桶時(shí)應使其與桶口對準,將壓膠盤(pán)排氣口翻開(kāi),直到壓盤(pán)接觸膠面。待壓盤(pán)內氣體全部排放完并有少量膠從排氣口溢出時(shí),即可關(guān)閉排氣閥。(提升開(kāi)關(guān)堅持下壓狀態(tài))
    3) Make the pressure plate of pump A drop slowly. When the pressure plate enters the barrel, it should be aligned with the barrel mouth. Open the outlet of the pressure plate until the pressure plate contacts the rubber surface. When all the gas in the pressure plate is exhausted and a small amount of glue overflows from the exhaust port, the exhaust valve can be closed. (Lifting switch sticks to down-voltage state)
    4)開(kāi)機試打膠:將主泵氣源開(kāi)關(guān)翻開(kāi),按下膠槍開(kāi)關(guān),直A泵里空氣排凈槍口處出膠連續時(shí)中止。
    4) Start-up test gluing: Turn the main pump air source switch on and press the glue gun switch until the air in pump A is discharged continuously.
    用同樣的辦法操作B泵。
    Operate B pump in the same way.
    3、打膠操作:1)松開(kāi)比例杠桿上的比例泵鎖緊螺釘,將比例泵內外調整所需比例。只要當A膠和B膠的配比到達正常值時(shí),才可停止下面的操作。
    3. Gluing operation: 1) Loosen the locking screw of the proportional pump on the proportional lever and adjust the internal and external proportions of the proportional pump to the required proportions. Only when the ratio of A glue and B glue reaches the normal value, can the following operation be stopped.
    2)置選擇旋鈕于A(yíng)、B泵開(kāi),將膠槍出口對準兩片玻璃的中縫,翻開(kāi)膠槍開(kāi)關(guān),以恰當速度平穩地挪動(dòng)膠槍使玻璃槽內的雙組份膠填滿(mǎn)充實(shí)為佳。打膠完畢時(shí)關(guān)閉膠槍。
    2) Place the selection knob on pump A and B, point the rubber gun outlet at the middle seam of the two pieces of glass, turn the rubber gun switch, and move the rubber gun smoothly at the appropriate speed to fill the two-component rubber in the glass tank. Turn off the glue gun when the glue is finished.

    雙組份打膠機
    4、改換膠桶:1)當膠桶內的膠用完時(shí),應立刻關(guān)閉A、B開(kāi)關(guān),中止打膠。
    4. Change the rubber drum: 1) When the rubber in the rubber drum is used up, the A and B switches should be closed immediately and the gluing should be stopped.
    2)翻開(kāi)A(或B)膠泵充氣開(kāi)關(guān),選擇A(或B)膠泵提升機構為上升位置,點(diǎn)動(dòng)旋鈕使壓盤(pán)漸漸提起,此時(shí)應留意:膠桶盡量不要分開(kāi)底盤(pán),直壓盤(pán)完整脫離膠桶時(shí)關(guān)閉A(或B)膠泵的充氣開(kāi)關(guān)。詳細操作:將B泵關(guān)閉,翻開(kāi)B膠回流開(kāi)關(guān)然后翻開(kāi)膠槍?zhuān)z條為白色即可。
    2) Turn on the inflatable switch of A (or B) rubber pump, select the lifting mechanism of A (or B) rubber pump as the ascending position, and point the knob to gradually lift the pressure plate. At this time, we should pay attention to: the rubber bucket should not be separated from the chassis as far as possible, until the pressure plate is completely separated from the rubber bucket, close the inflatable switch of A (or B) rubber pump. Detailed operation: Close the B pump, turn on the B glue reflux switch and turn on the glue gun until the glue strip is white.
    今天的精彩內容由雙組份打膠機整理提供,如有更多的合作事宜歡迎光臨我們的官網(wǎng):http://ruiyingjituan.com
    Today's highlights are provided by the two-component glue machine. For more cooperation, please visit our website: http://ruiyingjituan.com.

    聯(lián)系我們Contact us

    • 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
    • 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
    • 掃碼聯(lián)系我們:

    截屏,微信識別二維碼

    微信號:13705446998

    // RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>
    新时代下载安装最新版 RM新时代投资安全吗 RM新时代注册 RM新时代是正规平台吗 rm新时代平台靠谱吗