(1)現場(chǎng)條件應具備380V交流電源,工業(yè)自來(lái)水源、排水溝。大部分的中空玻璃設備和門(mén)窗設備都是380V的,主要為了維持設備工作的穩定性。干凈的自來(lái)水源,以及暢通的排水是清洗機良好工作的保障。
(1) The on-site conditions should have a 380V AC power supply, industrial water sources, and drainage ditches. Most insulated glass equipment and door and window equipment are 380V, mainly to maintain the stability of equipment operation. A clean water source and smooth drainage are the guarantees for the good operation of the cleaning machine.
(2)正確擺放進(jìn)料段機架、清洗段機架、干燥段機架、出料段機架、控制柜和通風(fēng)機箱。如果不按照順序擺放,一會(huì )降低工作效率,二會(huì )產(chǎn)品質(zhì)量不過(guò)關(guān)。
(2) Properly place the feed section rack, cleaning section rack, drying section rack, discharge section rack, control cabinet, and ventilation box. If not arranged in order, it will reduce work efficiency and result in poor product quality.
(3)調整支座調節整機水平度,允差1.5MM,縱向3MM(僅允許進(jìn)料段比出料段高)。
(3) Adjust the support to adjust the levelness of the entire machine, with a tolerance of 1.5mm and a longitudinal deviation of 3mm (only allowing the feed section to be higher than the discharge section).
(4)整機縱向水平度符合要求后將四段機架連接緊固(機架上備有連接螺栓副)。
(4) After the longitudinal levelness of the entire machine meets the requirements, connect and tighten the four sections of the frame (there are connecting bolt pairs on the frame).
(5)在進(jìn)料段機架與清洗段機架、清洗段機架與干燥段機架之間縫隙中涂上玻璃膠,以防止二處漏水。
(5) Apply glass glue to the gaps between the feed section frame and the cleaning section frame, as well as between the cleaning section frame and the drying section frame, to prevent water leakage at the two locations.
(6)按有關(guān)標準連接各傳動(dòng)系統。
(6) Connect each transmission system according to relevant standards.
(7)向水箱灌水前應將水箱清理干凈。
(7) Before filling the water tank with water, it should be cleaned thoroughly.
(8)安裝調整后按本說(shuō)明書(shū)規定之操作順序試車(chē)。
(8) After installation and adjustment, conduct a test run according to the operating sequence specified in this manual.
(9)清洗小規格玻璃片時(shí)請勿與傳送輥[gǔn]平行放置。
(9) When cleaning the minimum specification glass sheet, do not place it parallel to the conveyor roller [g ǔ n].
本文由中空玻璃加工設備友情奉獻.更多有關(guān)的知識請點(diǎn)擊: http://ruiyingjituan.com真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會(huì )陸續向大家奉獻.敬請期待.
This article is a friendly contribution from the hollow glass processing equipment. For more related knowledge, please click: http://ruiyingjituan.com Sincere attitude. We will provide you with comprehensive service. We will gradually contribute more relevant knowledge to everyone. Stay tuned
- 中空玻璃加工設備故障分析流程 2024/07/03
- 中空玻璃加工設備的現場(chǎng)安裝事項要點(diǎn) 2024/06/27
- 中空玻璃的生產(chǎn)過(guò)程是怎樣的? 2024/06/24
- 中空玻璃生產(chǎn)線(xiàn)的構造及功能介紹 2024/06/19
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: