RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    丁基膠涂布機自動(dòng)涂膠基本過(guò)程

    時(shí)間:2022-10-12 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械

    自動(dòng)涂膠基本過(guò)程
    Basic process of automatic gluing
    1.測寬:一次使用或鋁框寬度改變后,需要對鋁條進(jìn)行測寬,以便傳送時(shí)鋁框順利通過(guò)膠嘴。
    1. Width measurement: after one use or the width of the aluminum frame is changed, it is necessary to measure the width of the aluminum strip so that the aluminum frame can pass through the rubber nozzle smoothly during transmission.
    2.加熱:進(jìn)入自動(dòng)狀態(tài)后,膠嘴和膠盤(pán)要行加熱,同時(shí)傳送帶轉動(dòng),以免膠嘴溫度升高后將傳送帶燙壞,溫度高于80度以后打膠流程才會(huì )起效。
    2. Heating: after entering the automatic state, the rubber nozzle and the rubber disk shall be heated first, and the conveyor belt shall be rotated at the same time to avoid burning the conveyor belt after the temperature of the rubber nozzle rises. The gluing process will not take effect until the temperature is higher than 80 ℃.
    3.傳送打膠:當達到設定溫度后,手持鋁框放在傳送帶上,當前端打膠光電檢測到鋁框時(shí),自動(dòng)涂膠過(guò)程開(kāi)始。打膠光電有信號后,延時(shí)一段時(shí)間,前壓輪下壓,壓住鋁框;前壓輪下壓后延時(shí)一段時(shí)間,膠缸前進(jìn),膠嘴出膠。開(kāi)始涂膠后,再延時(shí)一段時(shí)間,后壓輪下壓。打膠光電信號消失后,延時(shí)一段時(shí)間,前壓輪抬起,前壓輪抬起后,再延時(shí)一段時(shí)間,膠缸停止前進(jìn),同時(shí)膠嘴停止涂膠;停止涂膠后,再延時(shí)一段時(shí)間后,后壓輪抬起,鋁框一邊涂膠完成。
    3. Transfer gluing: when the set temperature is reached, put the aluminum frame on the conveyor belt by hand. When the front end gluing photoelectric detects the aluminum frame, the automatic gluing process starts. After there is a signal from the gluing photoelectricity, delay for a period of time, and press down the front pressing wheel to press the aluminum frame; After the front pressure roller is pressed down, the rubber cylinder will advance and the rubber nozzle will release rubber. After the start of gluing, delay for a period of time and press down the rear pressure roller. After the photo electric signal of gluing disappears, delay for a period of time, the front pressure wheel is lifted, and after the front pressure wheel is lifted, delay for a period of time, the glue cylinder stops moving and the glue nozzle stops gluing; After stopping the gluing, after a period of time, the rear pressure roller will be lifted and the gluing on one side of the aluminum frame will be completed.
    之后重復傳送打膠流程,將鋁框剩余三邊全部涂上丁基膠,鋁框涂膠就全部完成。
    After that, repeat the transfer and gluing process, coat the remaining three sides of the aluminum frame with butyl glue, and the gluing of the aluminum frame is completed.
    因為大多數鋁框為方形而少數為圓形,所以在自動(dòng)中可以進(jìn)行方形和圓形的切換。當為圓形框涂膠時(shí),中間壓輪壓住圓框,同時(shí)皮帶轉動(dòng),膠嘴出膠,松開(kāi)腳踏開(kāi)關(guān)該過(guò)程停止。
    Since most of the aluminum frames are square and a few are round, you can switch between square and round in automatic. When the round frame is coated with glue, the intermediate pressure roller presses the round frame, and the belt rotates, the glue nozzle is released, and the process stops when the foot switch is released.
    以上就是為大家介紹的有關(guān)丁基膠涂布機的詳細的介紹,希望對您有所幫助.如果您有什么疑問(wèn)的話(huà),歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)
    The above is the detailed introduction of butyl rubber coater for you. I hope it will help you. If you have any questions, please contact us. We will provide you with services with a 

    聯(lián)系我們Contact us

    • 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
    • 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
    • 掃碼聯(lián)系我們:

    截屏,微信識別二維碼

    微信號:13705446998

    // RM新时代有限公司

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>

    <strong id="h4a17"></strong>
    <cite id="h4a17"></cite>
  • <sup id="h4a17"></sup>

  • <rt id="h4a17"></rt>
    <tt id="h4a17"><em id="h4a17"><font id="h4a17"></font></em></tt>
  • <tt id="h4a17"></tt>
    新时代下载安装最新版 RM新时代投资安全吗 RM新时代注册 RM新时代是正规平台吗 rm新时代平台靠谱吗