安裝雙組份打膠機的嚴謹性和事宜
時(shí)間:2017-10-23 來(lái)源:http://ruiyingjituan.com/ 發(fā)布人:昌盛機械
1、雙組份打膠機設備應安裝在干燥、無(wú)粉塵、無(wú)腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無(wú)腐蝕性氣體,畢竟設備中有電線(xiàn)以及管路這些配件抗腐蝕性不高)。
1, two-component glue machine equipment should be installed in a dry, no dust, no corrosive gas environment (the requirements, and other equipment of course if the condition is not up to at least for non corrosive gas, after all equipment of electric wires and pipeline corrosion resistance of these parts is not high).
2、室內溫度好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說(shuō)的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經(jīng)考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2, indoor temperature is best controlled in 10~40 degrees indoor hard ground, ground level should be better. (Tracy said here is to ground level must be very smooth for our equipment at the beginning of the design has taken into account the complexity of ground factors so the ground roughness is a considerable degree of patience, as long as not to mention anything else large amplitude can generally be normal work.)
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶(hù)在移動(dòng)打膠機的過(guò)程中把設備的智能控制系統的一個(gè)零部件碰掉了而導致設備無(wú)法正常運行,我們的工作人員到現場(chǎng)后才排查出的原因。
3, a two-component glue machine before installation, should check whether there is for transportation, moving caused by deformation and damage and loose fasteners, before once had the process of customer atx-ii in mobile in a part of intelligent control system of equipment off and leads to the normal operation of equipment, the reason for our staff to the scene after the investigation of the.
4、我們可以根據地面平整度的實(shí)際情況來(lái)通過(guò)調整設備的可升降地腳螺栓來(lái)調整設備的水平度直到設備水平而穩固。然后按圖接線(xiàn)并可靠接地,把氣源接入機器所配帶的氣源接口,確保無(wú)漏氣現象。
4, first of all, we can adjust the level of the equipment to the level and stability of the equipment according to the actual situation of the ground roughness by adjusting the lifting anchor bolt of the equipment. Then, the wiring is connected to the diagram and reliably grounded, and the gas source is connected to the air source interface which is equipped with the machine to ensure no leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通電源并打開(kāi)查看設備是否能夠正常運行。
6. Turn on the power and turn on to see if the device is functioning properly.
本文的精彩內容來(lái)自雙組份打膠機詳細內容請點(diǎn)擊我們的網(wǎng)站:http://linshi.jncsjx.com謝謝您的到來(lái)!
The wonderful content of this article comes from the two component dispenser, please click on our official website: http://linshi.jncsjx.com, thank you for coming!
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
- 玻璃涂布機設備的使用流程 2024/05/28
- 全自動(dòng)封膠線(xiàn):封膠機的種類(lèi)有哪些? 2024/05/24
- 玻璃涂布機設備的使用流程 2024/05/23
- 立式丁基膠涂布機的分類(lèi)以及工作原理 2024/05/22
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: