1 將中空玻璃生產(chǎn)線(xiàn)輕置于安裝位,正確擺放生產(chǎn)線(xiàn)各段的位置次序.
1 place the insulating glass production line gently at the installation position, and correctly place the position order of each section of the production line
2 機身調平.調整機器底座上調平螺栓高度,使傳送輥、支撐尼龍輪支撐面等高,斜架上的背靠輪共面,各段相對平行,然后鎖緊螺母.
2 fuselage leveling Adjust the height of the leveling bolt on the machine base so that the supporting surfaces of the transfer roller and the supporting nylon wheel are equal in height, the back-up wheels on the inclined frame are coplanar, and each section is relatively parallel, and then lock the nut
3 將各段間需聯(lián)接的部位聯(lián)接緊固,聯(lián)接好由入料段到清洗干燥段的傳動(dòng)鏈條.正確擺放風(fēng)機及水箱,并按水路、風(fēng)路系統圖接好風(fēng)管、水管.
3 connect and fasten the parts to be connected between the sections, and connect the transmission chain from the feeding section to the cleaning and drying section Place the fan and water tank correctly, and connect the air pipe and water pipe according to the water and air system diagram
4 一體檢查機器所有緊固件連接處是否因運輸震動(dòng)而松動(dòng),并逐件緊固(特別是各接線(xiàn)端子連接處是否松動(dòng)).
4 check whether all fastener connections of the machine are loose due to transportation vibration, and tighten them one by one (especially whether the connection of each wiring terminal is loose)
5 接地線(xiàn)用截面積不小于4平方毫米的軟銅心黃綠絕緣線(xiàn),接地電阻不大于4 歐姆.
5 the soft copper core yellow green insulated wire with a cross-sectional area of not less than 4mm2 shall be used for the grounding wire, and the grounding resistance shall not be greater than 4 ohms
6 接通氣源,檢查管路是否通暢,有無(wú)破損.氣源壓力要求0.6~0.8Mpa.
6 connect the air source and check whether the pipeline is smooth and damaged The air supply pressure shall be 0.6~0.8mpa
7 接通電源,試驗各電機的旋轉方向是否正確,各段傳動(dòng)鏈輪是否靈活、平穩.
7. Turn on the power supply and test whether the rotation direction of each motor is correct and whether the drive sprocket of each section is flexible and stable
8 整機清潔,整理工作區間.
8. Clean the whole machine and arrange the working area
本文的精彩內容由中空玻璃加工設備供知識提供,本網(wǎng)站還有很多的精彩內容,更多的內容您可以點(diǎn)擊進(jìn)入:http://linshi.jncsjx.com我們有專(zhuān)門(mén)的客服為您解答問(wèn)題
The wonderful content of this article is provided by the insulating glass processing equipment. There are many wonderful content on this website. You can click to enter more content: http://linshi.jncsjx.com We have special customer service to answer your questions
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
- 玻璃涂布機設備的使用流程 2024/05/28
- 全自動(dòng)封膠線(xiàn):封膠機的種類(lèi)有哪些? 2024/05/24
- 玻璃涂布機設備的使用流程 2024/05/23
- 立式丁基膠涂布機的分類(lèi)以及工作原理 2024/05/22
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: